Construction cost index (CCI) for agricultural buildings, excluding wage drift and VAT, 1980=100, by type of expenditure. Month 1980M01 - 2024M03

Logotype for official statistics

Choose variables

Read more about the survey
Jana Kaarto, Statistics Sweden
+46 010-479 45 93
Jonas Jonsson, Statistics Sweden
+46 010-479 40 65
Yes
2024-04-15
Construction Cost index (CCI) for agricultural buildings (excluding wage drift), 1980=100:
index
Construction Cost index (CCI) for agricultural buildings (excluding wage drift), 1980=100:
Construction Cost index (CCI) for agricultural buildings (excluding wage drift), 1980=100:
No
Construction Cost index (CCI) for agricultural buildings (excluding wage drift), 1980=100:
No
Construction Cost index (CCI) for agricultural buildings (excluding wage drift), 1980=100:
1980
Statistics Sweden
PR0502A4
Now you have come to the page, Choose variable. This page give you the oportunity to select which variables and values you want to display in your result of the table. A variable is a property of a statistical unit. The page is divided into several boxes, one for each variable, where you can select values by click to highlight one or more values. It always starts with the statistics variable which is the main value counted in the table.
Field for searching for a specific value in the list box. This is examples of values you can search for.total construction cost index , materials , labour ,

Selected 0 of total 8

Optional variable
Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.1980M01 , 1980M02 , 1980M03 ,

Selected 1 of total 531

Number of selected data cells are:
(maximum number allowed is 150 000)

Presentation on screen is limited to 1 000 rows and 30 columns

Number of selected cells exceeds the maximum allowed 150 000

Obs:

type of expenditure

total construction cost index

Data concerning December 2011 were corrected 2012-02-03.

total construction cost index

20140822 Index has been corrected because of a previous error in the calculations for Q1 2014

materials

20140822 Index has been corrected because of a previous error in the calculations for Q1 2014

contractor´s costs

20140822 Index has been corrected because of a previous error in the calculations for Q1 2014

investor´s costs

Data concerning December 2011 were corrected 2012-02-03.

investor´s costs

20140822 Index has been corrected because of a previous error in the calculations for Q1 2014

month

2012M12

The table was corrected 2013-02-15.

2020M03

The temporary reduction in employers’ tax that applies from 1 March to 30 June 2020 has not been taken into account

2020M04

The temporary reduction in employers’ tax that applies from 1 March to 30 June has been taken into account. In March, there was no basis for calculating the effect on the Construction Cost index.

2020M05

The temporary reduction in employers’ tax that applies from 1 March to 30 June has been taken into account. In March, there was no basis for calculating the effect on the Construction Cost index.

2020M06

The temporary reimbursement for the entire sick pay cost that applies from 1 April to 31 July and the temporary reduction in employers’ costs that applies from 1 March to 30 June 2020 has been taken into account as from the second quarter of 2020. In March 2020, there was no basis for calculating the effect on Construction Cost index

2020M07

The temporary reimbursement for the entire sick pay cost that applies from 1 April to 31 July and the temporary reduction in employers’ costs that applies from 1 March to 30 June 2020 has been taken into account as from the second quarter of 2020. In March 2020, there was no basis for calculating the effect on Construction Cost index