Construction cost index (CCI) for new residential buildings, including wage drift, excluding VAT, 2015=100, by type of expenditure (Eurostat). Quarter 1990K1 - 2023K4

Choose variables

Read more about the survey
Jana Kaarto, Statistics Sweden
+46 010-479 45 93
Jonas Jonsson, Statistics Sweden
+46 010-479 40 65
No
2024-02-15
Construction Cost index (CCI) for new residential buildings (including wage drift, excluding VAT), 2015=100:
index
Construction Cost index (CCI) for new residential buildings (including wage drift, excluding VAT), 2015=100:
Construction Cost index (CCI) for new residential buildings (including wage drift, excluding VAT), 2015=100:
No
Construction Cost index (CCI) for new residential buildings (including wage drift, excluding VAT), 2015=100:
No
Construction Cost index (CCI) for new residential buildings (including wage drift, excluding VAT), 2015=100:
2015
Statistics Sweden
PR0502I1
Now you have come to the page, Choose variable. This page give you the oportunity to select which variables and values you want to display in your result of the table. A variable is a property of a statistical unit. The page is divided into several boxes, one for each variable, where you can select values by click to highlight one or more values. It always starts with the statistics variable which is the main value counted in the table.
Mandatory

Selected 0 of total 3

Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.1990K1 , 1990K2 , 1990K3 ,

Selected 1 of total 136

Number of selected data cells are:
(maximum number allowed is 150 000)

Presentation on screen is limited to 1 000 rows and 30 columns

Number of selected cells exceeds the maximum allowed 150 000

Obs:

Index figures have been revised regarding total factor price index and labour. For Quarter 1 2006.

type of expenditure

total construction cost index

Indexes for labour cost and total factor price index quarter 4 2009 has been revised

total construction cost index

20140822 Index has been corrected because of a previous error in the calculations for Q1 2014

materials

20140822 Index has been corrected because of a previous error in the calculations for Q1 2014

labour

Indexes for labour cost and total factor price index quarter 4 2009 has been revised

quarter

2012K2

The table was corrected 2013-02-15.

2012K3

The table was corrected 2013-02-15.

2017K3

Final figures were published 2017-12-15.

2020K1

The temporary reduction in employers’ tax that applies from 1 March to 30 June 2020 has not been taken into account

2020K2

The temporary reimbursement for the entire sick pay cost that applies from 1 April to 31 July and the temporary reduction in employers’ costs that applies from 1 March to 30 June 2020 has been taken into account as from the second quarter of 2020.”
In the first quarter of 2020, there was no basis for calculating the effect on Construction Cost index.