To the Top
The 3 steps are Choose table, Choose variable and Show result. You are currently at Choose variable

Number of rented dwellings by type of ownership, year of construction/valuation, year range and annual rent (Sample survey, see footnotes.) Year 2003 - 2010

Logotype for official statistics

Choose variables

Read more about the survey
Malin Sundberg, Statistics Sweden
+46 010-479 41 62
Byggande och bebyggelse, Statistics Sweden
- -
Yes
2011-09-29
Number of dwellings:
number
Number of dwellings:
Flow
Number of dwellings:
No
Number of dwellings:
No
Statistics Sweden
BO0406E7
Now you have come to the page, Choose variable. This page give you the oportunity to select which variables and values you want to display in your result of the table. A variable is a property of a statistical unit. The page is divided into several boxes, one for each variable, where you can select values by click to highlight one or more values. It always starts with the statistics variable which is the main value counted in the table.

Selected 0 of total 4

Optional variable
Mandatory

Selected 0 of total 2

Field for searching for a specific value in the list box. This is examples of values you can search for.- 1940 , 1941-1950 , 1951-1960 ,

Selected 0 of total 10

Optional variable
Field for searching for a specific value in the list box. This is examples of values you can search for.–20 999 , 21 000–24 999 , 25 000–28 999 ,

Selected 0 of total 13

Optional variable
Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.2003 , 2004 , 2005 ,

Selected 1 of total 8

Number of selected data cells are:
(maximum number allowed is 150 000)

Presentation on screen is limited to 1 000 rows and 30 columns

Number of selected cells exceeds the maximum allowed 150 000

Obs:

The estimates of numbers of rented dwellings can be find on the websites for the dwelling stock, projections. http://www.scb.se/BO0104
The survey is a sample survey based on a probability sample. The reported figures are estimated and consideration must therefore be taken of the uncertainty in these when conclusions are drawn. Estimated/Estimations that are too much uncertain are replaced with two dots.

year of construction/valuation

year of valuation

Reporting for year of valuation is only available from year 2002.